Cemented carbide wire drawing die for pipe and mandrel

Unground Tungsten cemented Carbide bar drawing Dies for metal drawing1. 100% raw material to produce tungsten carbide products.2. Hip sintered, high hardness, high wear resistance3. Various sizes and full types available 4. Reasonable price,Fast delivery time5. OEM Customized(small order accepted,professional tech

Featured Products

Unground Tungsten cemented Carbide bar drawing Dies for metal drawing
1. 100% raw material to produce tungsten carbide products.
2. Hip sintered, high hardness, high wear resistance
3. Various sizes and full types available 
4. Reasonable price,Fast delivery time
5. OEM Customized(small order accepted,professional technical support)
6.ISO 9001 Certification
More details of specific type, please inform us
Product information
Tungsten Cemented Carbide Drawing Dies for Tubes and Core Rods
 Grade information
Tungsten carbide grade introduction
GradeEquivalentHardnessBending strengthDensityPerformances & Applications
to ISO(HRA)≥(N/mm2)≥(g/cm3)≥
YG6K2089.8170014.7-15.1 
YG8K3089.5189014.6-14.9 

Company Information
Tungsten Cemented Carbide Drawing Dies for Tubes and Core Rods
Tungsten Cemented Carbide Drawing Dies for Tubes and Core Rods

Production process
Tungsten Cemented Carbide Drawing Dies for Tubes and Core Rods
Applications 

Tungsten carbide wire/rod/bar drawing die is mainly for ferrous and non-ferrous metal drawing to required size of bar, wire and rods.  it is much longer life the steel mould. we can also offer PDC drawing die.

Packing and Delivery
Tungsten Cemented Carbide Drawing Dies for Tubes and Core Rods

Payment terms

Tungsten Cemented Carbide Drawing Dies for Tubes and Core Rods

RAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 25-35 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<1000USD, 100% in advance. Payment>1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us!

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours